莫桑比克鼎盛矿业

Establishment of water treatment plant
Establishment of water treatment plant
In order to benefit the local population and to solve the problem of domestic water supply in the mining area, a standard water supply plant of 10,000 cubic metres per day has been built by Dingsheng Minerals. The water quality meets or exceeds the Mozambican national water standard and can meet the domestic water needs of 150,000 people, providing free tap water to the resettlement area and nearby residents.